In 2016 MN Builders in conjunction with Metromix undertook the development of 3 stages of 5 star apartments on the banks of the Georges River at Liverpool.
Metromix overcame many obstacles while servicing these 3 stages,
- Supplying in total over 30 000m3 to complete the job.
- Heavy traffic on major roads and throughout peak times.
- Delivering concrete at different time requests.
- Supplying concrete for large pours 700m3 with minimal disruption.
Metromix drivers and staff worked closely with MN Builders to make sure pours ran as smoothly as possible with the end result being a positive one for all concerned.